Complete Remodeling in Queens and the NYC area

Whole apartments and whole houses, from demolition to the finished room. One crew for the kitchen, the bathrooms, the floors and the paint.

  • 5.0 rated on Google and Angi and Birdeye
  • Free estimatesConfirm
  • Warranty on the workConfirm
  • Licensed and insured
  • Emergency serviceConfirm

How we do it

Full apartment and house remodels, demolition through finished rooms, run by one crew from start to end.

A complete remodel means everything comes out first, down to the studs in most rooms, before anything new goes in. That order matters. Plumbing and electrical get roughed in and inspected while the walls are still open, then insulation and drywall close things up, then floors, then trim and paint last. Skip that sequence and you end up with a painted wall that has to be cut open again for a pipe nobody planned for.

Most of the work around Long Island City and western Queens is either a prewar walkup with plaster walls and old cast iron plumbing, or a newer condo with concrete floors and board rules about noise hours and protected hallways. Both change how the job gets scheduled and what has to be filed with the building or the city before demo starts.

When a remodel is run as separate hires instead of one crew, the common failure is mismatched work: a floor guy who sands after the painter already finished, a plumber who roughs in a sink two inches off from where the vanity actually sits. Running it as one job avoids that kind of rework.

Newly finished room with recessed lighting and a glass slider to the yard

Included

Complete Remodeling: what is included

  • Full demolition and debris removal
  • Plumbing and electrical rough in and inspection
  • Framing, insulation, and drywall
  • Flooring, trim, doors, and paint through every room
  • Kitchen and bathroom builds as part of the same job
  • Coordination with building management or co-op board where required

Process

Five steps, in this order.

Measured and priced before anything comes out, then built in the sequence that keeps finished work from being torn open again.

  1. Measure and price

    Every room is measured and the full scope is priced before demolition starts, so there are no surprise change orders mid job.

  2. Demolition

    Existing finishes come out down to the studs or subfloor, and the crew confirms what the walls and floors are actually hiding.

  3. Rough in

    Plumbing, electrical, and any framing changes go in and get inspected before anything is closed up.

  4. Close up and finish

    Insulation, drywall, flooring, trim, and paint go in, in that order, room by room.

  5. Fixtures and punch list

    Cabinets, fixtures, and hardware go in last, and a final walkthrough catches anything that needs touching up.

Reviews

What customers say.

Homeowners rate Batusha Corp at the top on every platform they review us on. What they mention most is Vigan himself: clear communication, a fair price and work finished when he said it would be.

“I am beyond delighted with Vigan and Batusha Corp. Vigan built a deck for my backyard and the work is incredible. Vigan’s price was fair, he did everything he said he would do and completed the project on time. Vigan and his crew was respectful and hard working. Batusha is now my go to for my construction projects.”

Marguerite D.Deck building

Questions

Complete Remodeling, answered.

Do I need to move out during a full remodel?

It depends on how many rooms are torn open at once and whether the water or power has to be shut off for stretches at a time. We walk through the scope with you and tell you honestly what living conditions will look like week to week.

Will my co-op board slow this down?

Most boards want a scope of work, proof of insurance, and sometimes a licensed architect's filing before they approve alteration work. We help put that packet together during planning so it does not stall the job once it starts.

Can you work around plaster walls instead of tearing them out?

Sometimes, if the plaster is sound and not cracked or hollow behind the surface. We check it room by room and tell you where patching makes sense and where it is cheaper in the long run to just open the wall.

Free estimate

Tell us about the job.

Send a few details and we will set up a visit to measure and price it. Prefer to talk? Call or text.

  • 5.0 rated on Google and Angi and Birdeye
  • Free estimatesConfirm
  • Warranty on the workConfirm
  • Licensed and insured
  • Emergency serviceConfirm

Goes straight to batushacorp@gmail.com. No spam, no sharing.

Call Free estimate